Page 62 - Hub Magazine Issue 56
P. 62

Recycling
Central Demolition upgrade
their processing capabilities
with a Blue MRF
Central Demolition started life in 1993 as Central Demolition & Dismantling and has continued to grow into the award-winning company it is today. Back in 1993, Central Demolition Ltd comprised of one excavator and one tipper and has now grown to employ nearly 200 members of staff, operating a mixed fleet of HGV vehicles and 100 items of plant equipment from their Bonnybridge HQ.
The recycling element of the business commenced in 1997 supplying skips to domestic and commercial customers, recycled aggregates and tipping facilities.
In the 25+ years in business, the company has undertaken some high-profile contracts including the John Brown Ship Yard, the former NS&I Bank HQ in Glasgow, former Alcan Chemicals Factory and the Belsmyre High Rise Flats.
down with BlueMac Manufacturing they resolved any issues with a bespoke design that really worked for us.”
Part of the Blue Group, BlueMac are based in Northern Ireland and specialise in the design and manufacture of cutting-edge recycling systems, material recovery facilities and bespoke machinery.
“The new plant incorporates a Spaleck® screening machine”, added John.
“To be honest we had previously used a trommel and at first I had some reservations but it’s a first-class piece of kit and has exceeded my expectations.”
Spaleck® Waste Screen:
The Spaleck® waste screen at Central Demolition incorporates a vibrating screen with an optimum circular motion and is driven by a high-performance and equally efficient three- phase AC motor. The blind bottom on the in-feed side guarantees an efficient utilisation of the screening surface and creates a good material flow which increases the service life of the screening elements and reduces blocking material.
Additionally, the screening elements can be changed easily and quickly and are therefore easy to adjust to the different sized cuttings.
The sub-frame compensates the residual vibrations of the screen. The optional cover can be opened without using tools and ensures quick access to the screening module. Overall the Spaleck® provides economic operation which requires low maintenance and is inherently maintenance friendly.
With an aged plant, changing regulations and the need to upgrade their MRF, Central Demolition have recently invested in a new bespoke twin line MRF featuring a Spaleck screen which has been supplied and commissioned by Blue Scotland in August 2018.
Having supplied the original plant 11 years ago, Blue Scotland and Central Demolition have built a solid relationship over the years with Blue supplying other equipment, including several Fuchs Material Handlers that feed the new MRF.
John Ellis – Plant Manager, takes up the story, “Changing regulations and the desire for more throughput with the capability of a bigger picking team making the whole operation more efficient has been the driver for a new plant. The biggest primary issue was the footprint but when we sat
| p62 |
www.hub-4.com May/June 2019 - Issue 56


































































































   60   61   62   63   64