Atlas Copco wins order in Turkey for high-speed train tunneling project
-
- 22 December 2007
- Company & Industry News
The order was booked in the fourth quarter and includes 13 tunnel drilling rigs and two surface crawler rigs, which will be used for the second phase of the high speed train project. The equipment will be used for excavation of 39 kilometers of tunnel in 40 different locations. Upon completion in 2010, the new railway will more than halve the travel time between Ankara and Istanbul to approximately 3 hours.
"The productivity and reliability of our equipment was essential in winning this order and we are proud of the strong relationship we are building with Cengiz-IC Ictas-Belen," says Björn Rosengren, President of Atlas Copco's business area Construction and Mining Technique. "This project highlights the increasing importance of global infrastructure development for the growth of our business."
The contract also includes orders from IC Ictas and Cengiz for drill rigs and load handling equipment to be used in other projects.
Associated Links
Other news articles
-
A world first: Atlas Copco SB 702, the only 700 kg hydraulic breaker with a solid body
-
Atlas Copco launches new breaker variant: The MB Essential breaker range
-
New Hydraulic Breaker HB 4100 from Atlas Copco
-
Atlas Copco´s heavy breakers for rip-rap and armor stone supplier in Virginia, USA
-
Atlas Copco has completed acquisition of SCA
