- The Source at MeadowhallThe Source at Meadowhall
The Source is a flagship Centre providing state of the art training, development and conferencing facilities for all sectors of the local community and...

Latest World News
Finedoor supply new aggregate screen for CEMEX - Cowieslinn Quarry.

- 22nd October 2007
- Quarrying
The CEMEX Quarry at Eddleston, near Peebles, Scotland has been operational since 1985 and has substantial gritstone deposits processing approximately 400,000 tonnes per annum. Cowieslinn currently operates a fixed plant featuring a 50" x 42" Primary, two cone crushers, one VSI, and five screens; with processed material being supplied to local markets.
Recently Cowieslinn quarry supplied aggregates for the new CEMEX UK concrete block and paving facility at West Calder near Livingston, Lothian, which will be one of the biggest factories in Scotland. The £5 million plant represents a significant investment in the region, and will have a production capacity of 1.2 million square metres, producing enough blocks and pavers to fill 20 Olympic-sized swimming pools per annum.
The contract required for the installation of a new aggregate screen to accommodate changes in the production line. The new screen which is fed from an existing feed conveyor replaces a by-pass chute which formerly replaced an existing screen.
Finedoor supplied a 4.3m x 1.5m - 2 deck aggregate screen with grease lubrication complete with feed and discharge trays. An SCS polyurethane self supporting modular system with full side protection and centre, bars, wedge and pin fixing system was also supplied.
The screen was designed and manufactured within Finedoor's workshop where the actual operation of the unit was fully tested and ‘dry run' before transportation to site where it was installed by the quarry engineers.
Finedoor has over 40 years of previous experience in providing bespoke solutions for the quarry and recycling industries in the fields of design, manufacture, installation, operation and repair of quarry equipment and plant.
Paul Nairn, Quarry Manager, commented, "It has been a pleasure to deal with Finedoor, they have supplied us with a bespoke quality product within a very tight timescale."
Further information:
Finedoor Ltd, Unit 4 & 5
Melbourne Street
Morley
Leeds LS27 8BG
Tel: 0113 2527601
Fax: 0113 2527603
Email: enquiries@finedoor.co.uk
Web: www.finedoor.co.uk
Associated Links
Other news articles from Finedoor Ltd
The 1st ORTNER aggregate washing plant delivered to Ireland!
Top Safety Accreditation for Finedoor Ltd.
Finedoor increase production for Gulf Rock Engineering Group.
Finedoor launch 1st Industry Showcase!
Screen Replacement in Record Time!
Finedoor introduce ORTNER© into the UK
New screen replacement for Brett Hall Aggregates at Dover.
New screens from Finedoor, facilitates easier maintenance for Hafod Quarry.
Tarmac invest in improved screen technology.
Nigerian success for Finedoor
Finedoor complete upgrade for Scord Quarry
World



