View HUB-4 Magazine Now Click to view Product Focus
Keep up to date with our email newsletter
Our Partners
BULK 2010
  • Hamilton RentalsHamilton Rentals

    Hamilton Rentals has over 45 years experience and a £25 million IT rental fleet made up of products from the leading manufacturers including HP, IBM and...

    Hamilton Rentals
  • ShowplaceShowplace

    Showplace, established in 1987, is a leading European provider of hospitality, exhibition and event management services. Based in Stratford upon Avon,...

    Showplace
  • The Source at MeadowhallThe Source at Meadowhall

    The Source is a flagship Centre providing state of the art training, development and conferencing facilities for all sectors of the local community and...

    The Source at Meadowhall
 
HUB Magazine

HUB-4 publishes a brand new magazine for the Materials Handling, Recycling & Quarrying Industries.

View HUB-4 Magazine Now Download PDF Version
 
0845 680 0024

Latest World News

Blue Group

Blue Supplies Britania Crest with new C&D Recycling Plant

Blue Supplies Britania Crest with new C&D Recycling Plant
With the impetus never being greater to divert waste from landfill with ever tightening legislations, Britania Crest, based in Hookwood, Surrey have recently purchased a new C&D recycling plant from Blue Machinery (London) Ltd.  As one of the South East's largest family owned skip hire and waste recycling companies, it was felt the time was right to invest in a waste separation system to improve the efficiency of their operation.  Starting out in 1993, Britania Crest has excelled in providing an affordable and professional service in the collection and handling of local authority, commercial, construction and domestic waste from the Surrey and West Sussex areas.

The long and successful business relationship with Blue ensured that Britania Crest had no doubts as to whom they should turn to for the design and installation of their new C&D recycling plant.  Having cast an eye over the various technologies available on the market for a number of years, Britania Crest decided that Kiverco, distributed throughout the UK by Blue, was the best option.

Commenting on the new plant, Director Chriss Foss said "With an investment of such magnitude, it was vital that we made the right decision and got a system tailored to our needs.  As a result, we spend a number of years looking at the various options available to us and decided to go with the Kiverco plant from Blue for a number of reasons.  Firstly, we felt that the build quality of the Kiverco was unrivalled.  Due to the strong manufacturing, we feel the robustness of the plant will ensure we get better value for money in the long run", Chris added "The people at Blue fully understood our operational requirements, displaying their expertise in providing a solution to fulfil our specific needs.  Their team were first class from initial design phase through to plant installation."

The new plant consists of a number of different modules which are combined to ensure maximum recovery of materials.  At the front end, the material is fed onto a 1200mm wide belt feeder which delivers the material into the Kiverco 835 static trommel.  Fitted with 40mm punch plate for removal of fines, the fully enclosed rotating screening drum is 13 metres in length and 3.30 metres in diameter.   The fines then drop down and onto a collection conveyor which transfers the material out of the building and directly onto a Powerscreen Warrior 1400 for secondary screen to produce a 0-6mm soil, 6-20mm stone and 20-40mm for concrete.   A series of free standing feed, transfer and discharge conveyors provide the essential linkage to ensure flow of material through the processing equipment. 

Space restrictions meant running the picking station at a 90 degree angle to maximise the potential of the building, this is then fed with an incline conveyor directly from the trommel. The Kiverco picking station is fully enclosed with heating and lighting for operatives' comfort and safety.  4 Bays and 8 drop chutes are positioned either side of the picking belt to enable Britania to remove plastics, carboard, papers and wood.  An overband magnet and a blower are positioned at the end of the station for the safe removal of ferrous metals and lights after picking.

Commenting on the early success of the plant, Chris Foss said "Prior to the installation of the new plant, we used to use our grab to pick of the large items then screen of the fines achieving approximately 67% recoverable.  With the new system, we are already seeing our recycleable rate at 95%"

Blue Group
Appleton Thorn Trading Estate
Appleton
Warrington
Cheshire
WA4 4SN
UK

T: 0845 217 8755

www.bluegroup.co.uk
F: 0845 658 2314

Associated Links

 

Other news articles from Blue Group